Remember this post?? Well... despite my lack of blogging, progress still has been made!!! Fortunately things don't stop just because I fall behind on blogging. :-)
Here's a rundown of what has been accomplished:
A pocket door was installed~
The new bathtub area was framed in~
The exterior side of this wall got the drywall patched~
The floor started being laid~ (and it is breathtakingly beautiful!)
Plumbing was roughed in ~
Flooring was finished!
And the shower (to the left in this photo) was framed in.
Isn't it amazing!? :) Isn't my HUSBAND amazing?! That's ALL his handy-work!
Here's a rundown of what has been accomplished:
A pocket door was installed~
The new bathtub area was framed in~
The exterior side of this wall got the drywall patched~
The floor started being laid~ (and it is breathtakingly beautiful!)
Plumbing was roughed in ~
Flooring was finished!
And the shower (to the left in this photo) was framed in.
Isn't it amazing!? :) Isn't my HUSBAND amazing?! That's ALL his handy-work!
1 comment:
It most certainly is beautiful!
Post a Comment